Looking for Answers about Paragon Spin Magic Cotton Candy Machine w/Metal Bowl?

Shop now at Tundra Restaurant Supply
or
Choose a Category
Most Recent Questions
Questions with Most Recent Answers

Customer Questions & Answers for
Paragon Spin Magic Cotton Candy Machine w/Metal Bowl

Spin Magic Cotton Candy Machine w/Metal Bowl; New high performance head will not clog like ordinary ribbon style heating elements; All metal design provides superior durability over those using plastic parts; Heavy duty motor completely shielded from sugar to extend its life; Easy clean up; Professional controls give the operator flexibility; Stainless steel cabinet delivers commercial quality and durability; Yields up to 200 cones per hour; Made in the USA; 3 Year Warranty
Customer Questions & Answers:
1 Question
 | 
1 Answer

Questions & Answers for Paragon Spin Magic Cotton Candy Machine w/Metal Bowl

Question

how do you clean the head

asked 3 years, 2 months ago
Customer Avatar
by
batty
pa
on Spin Magic Cotton Candy Machine w/Metal Bowl
0points
0out of 0found this question helpful.
Answer this Question
1 answer
Answers
answer 1
ROUTINE CLEANING
1. Be sure the MOTOR and HEAT switches are in the “OFF” position. (Cord should also be
unplugged from outlet.)
2. Allow the SPINNING HEAD unit and components to cool down to a temperature that is safe to
the touch.
3. Remove the four retaining nuts and leather floaters on the top of the SPINNING HEAD unit.
4. Remove the top from the SPINNING HEAD unit by lifting it off.
5. Remove the slinger plate by loosening the two nylon acorn nuts in the center.
6. Disconnect the two heater lead terminations by removing the two nuts (3/8” Hex) and removing
the leads from the studs.
7. Remove the outer screen assembly with the heating element by sliding it straight up.
8. The top and the screen assembly with heating element can be cleaned by immersing in hot
water and mild detergent.
9. The head base is now accessible for removing the sugar residue by manual cleaning with a
damp cloth.
10. After allowing the components to dry completely, the screen assembly with heating element can
be reassembled by placing the items on the head base.
11. Reconnect the two heater lead terminations with the two nuts (3/8” Hex) be sure to route the
wire leads as to avoid any sharp bends.
12. Reinstall the slinger plate using two nylon acorn nuts.
13. Reassemble the top and secure with the four retaining nuts. Leather floater should be installed
on two opposing studs.

I have also attached a document to the "Learn More" tab that demonstrates how to remove the spinning head.
answered 3 years, 2 months ago
Customer Avatar
by
Molly
Boulder, CO
0points
0out of 0found this answer helpful.
1 of 1